We at Green Machine have focused our efforts to design a complete single stream recycling system that requires the least amount of upfront capital, labor, and building space. The complete system is capable of processing 6-12 TPH of traditional single stream material within a 17,000 sq. ft. building space with 20 ft. ceilings, and can be operated with only 5-10 employees! Our modular phased approach requires little to no site work and enables recycler’s low initial start-up costs with the ability to grow.
Manual, semi, and fully-automated systems utilizing hyperspectral artificial intelligent optical and robotic technologies.
Explore the August 2019 Issue
Check out more from this issue and find your next story to read.
Latest from Recycling Today
- Regenx says US facility back online
- Cliffs has money losing Q3
- BIR Autumn 2024: Supply challenges poised to grow
- Befesa reports double-digit adjusted EBITDA growth in Q3
- Companies partner to standardize build of chemical recycling plants
- Solarcycle to add recycling plant to Georgia campus
- PPRC 2024: Addressing the packaging recovery problem
- Cliffs completes Stelco acquisition